手机版

发电机保护及自动装置设计 毕业设计(2)

发布时间:2021-06-08   来源:未知    
字号:

沈阳工程学院毕业设计(论文)

Abstract

The use of power energy has applies in every field of social、economics and life, and in the structure of power energy of our country, the capacity of power equipment count for 75% of the total installation capacity. This paper is the preliminary design of a middle thermal power plant, equipped with two turbo-generators of 600 MW. This paper carries on mainly the design of main electrical connection and generator – transformer protection. The design of main electrical connection includes the comparison and selection of electric main connection mode; the selection of main transformer、and startup/ standby transformers; the calculation of short circuit current and the selection and test of high voltage equipment. The part of generator – transformer protection design introduce configuration rules of generator-ransformer protection and several mainly protection such as generator-ransformer differential protection、generator differential protection、stator earthing protection. The last it simply design the planning of defending the thunder and ground protection.

Key words: turbo-generator;main electrical connection;generator – transformer unit protection

发电机保护及自动装置设计 毕业设计(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
×
二维码
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)