英文版的闭式水系统调试作业指导书

1 Objective

1.1 In order to instruct and control the commission work of system and equipments so as to guarantee the system and equipment can be put into operation safety and normally, this commissioning procedure is prepared.

1.2 Check the Electrical, C& I signal devices and interlock protection according to this commissioning procedure and make sure the indication is correct and action is reliable.

1.3 Check the running condition of the equipment and system according to this commissioning procedures, check the performance of the system so that the possible defectives can be removed.

1.4 This procedure is an introduction document. Commission engineer can modify the contents, which are not proper for site situation. As long as the commission purpose is reached and function at performance of turbine generator unit is checked to meet the requirement of design and operation, then all reasonable test, check, measure and operation method and steps are allowed.

2 Description to system and main equipment technical specification

Closed circulation cooling water pump

Type: KQSN300-N13/303

Flow: 550t/h

Head: 40m

Motor power: 55KW

Voltage: 400V

3 Commission range

Closed circulation cooling water system consists of closed water expansion

tank, closed water pump, turbine side water-water exchanger, coolers, valves, indication instruments of closed circulation cooling water. Water source is provided by chemical water or condensate water. The primary cooling water of closed circulation cooling water system adopts chemical DM water, secondary

闭式水系统调试作业指导书(英)(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
×
二维码
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)