桥箱梁连续焊接临时支座施工工法

发布时间:2021-06-07   来源:未知    
字号:

桥箱梁连续焊接临时支座施工工法

作者:张希舜 杨德基 陈玉平 丛福祥 徐景国 徐艳凤

来源:《城市建设理论研究》2012年第35期

摘要:采用先简支后连续桥梁结构施工技术,可把连续箱梁分段预制成小箱梁,再通过施工中的体系转换变为连续梁。由于小箱梁按简支进行预制施工,避免了现浇所需的支架;通过体系转换变成连续梁结构,使梁体受力合理,跨中弯矩大大减少,降低了工程造价。因此,桥梁上部采用先简支后连续梁结构越来越多。

关键词:连续桥梁;结构;施工技术

Abstract: The simply supported continuous bridge construction technology, the continuous box beam prefabricated box beam segment, and through the construction of system transformation for continuous beam. Because of small box girder by simply supported precast construction, avoid the cast-in-situ required stent; through the system is converted into continuous beam structure, make the beam body reasonable stress, mid-span moment greatly reduced, to reduce the cost of project. Therefore, the upper bridge with simply supported continuous beam structure more and more. Key words: continuous bridge; structure; construction technology

中图分类号:U445 文献标识码:A文章编号:

前言

1.0.1 桥梁上部连续箱梁采用现浇的施工方法需要大量的支架材料,经济效益较差;支架搭设和结构混凝土施工时危险性较大,社会效益较低。

把小箱梁转换为连续箱梁的施工过程中,必须采用临时支座对小箱梁安装,然后才能进行体系的转换。

由于该“临时支座”采用钢板和钢筋焊接而成具有很高的抗压强度,可承受箱梁的压力并传给桥墩的盖梁;由于钢板表面平整,施工时只须把临时支座放到盖梁相应位置即可,施工方便。体系转换时,只须用火焰切割机把钢筋切断,钢板就会掉落,完成体系转换,操作简单。因此具有较好的推广前景。钢板-钢筋焊接临时支座简图见图1.0.1—1。

图1.0.1—1 钢板-钢筋焊接临时支座简图

近几年我公司在安徽、浙江、江苏等地连续箱梁桥施工中,采用钢板-钢筋焊接临时支座进行小箱梁先简支后连续体系转换的施工。在施工的实践中,我们不断进行总结,最终形成本工法,我公司针对这一工法申报了国家实用新型专利,并且获得了“桥梁先简支后连续箱梁施工临时支座”专利授权,专利号:ZL 2010 20140228.8。

桥箱梁连续焊接临时支座施工工法.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
    ×
    二维码
    × 游客快捷下载通道(下载后可以自由复制和排版)
    VIP包月下载
    特价:29 元/月 原价:99元
    低至 0.3 元/份 每月下载150
    全站内容免费自由复制
    VIP包月下载
    特价:29 元/月 原价:99元
    低至 0.3 元/份 每月下载150
    全站内容免费自由复制
    注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
    × 常见问题(客服时间:周一到周五 9:30-18:00)