The topic of this graduate design is about the design of the sewage treatment plant in the development area of economy and techonology in Da lian City. The technics of the plant is the inverted AAO process. The main task is the primary design of the plant and the shop drawing of the oxidation ditch pond.

The task of the primary design is that a design book、a plan of the plant、the high drawing of the treatment of sludge and sewage; In the single disposal build design, the harvest is that the section plane drawing、the plan and some part magnifying drawings of the inverted AAO process.

The construction of this plant is 70000 ton per day.

The process of the sewage in the plant is that: The sewage runs from pump house to sand sinking pond, enters the pond of sedimentation tank, enters disinfection pond, then enters calculation trough, at last lets out. The process of the sludge is that: Surplus sludge from the sedimentation tank enters concentration pond, enters digestion pong, then it is dehydrated, at last it is carried out of the plant.

The outlet water of the plant meets the level two of the National Sewage Discharge Standard (GB8978-1996).

There is an inverted AAO process prevents sludge from eapending, promots releasing phosphorus ,and strengthens anti-nitration.

Key words:The inverted AAO process, Taking off the nitrogen and the phosphorus

某污水厂设计倒置AAO工艺(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
×
二维码
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)