Power will be the key limiter to system scalability as interconnection networks take up an increasingly significant portion of system power. In this paper, we propose an architectural leakage power modeling methodology that achieves 95-98 % accuracy agains

Table5:Dynamicandleakagepowerestimatesofanon-chiprouteranditslinks.

Figure2:Leakagepowerdistributionacrossthemajor

functionalunitsofanon-chiprouter:bu ers,arbiters,

crossbarandlinks.Arbiterleakagepowerisnegligibleandnotvisibleinthe gure.

Toexplorethepotentialofpower-awarebu ers,we rstcharacterizenetworkbu erutilizationwiththetra cmodelproposedin[8],withPoissontaskinter-arrivalrate,andself-similarpacketinter-arrivalrateswithineachtaskses-sion.Thisworkloadexhibitsthehightemporalandspatialvariancepresentinmanyreal-lifenetworks.Wesimulatethechip-to-chipnetworkdescribedinSec.3(2virtualchan-nelsperport).Fixed-lengthpacketsof20 itsareassumed.Fig.3graphstheaverageandminimumnumberofidlebu ersastra cincreases.Asexpected,alargenumberofbu ersisleftidleatlowinjectionrates.Interestingly,whiletherearerouterswhosebu ersarefully-occupied(minimumnumberofidlebu ers=0)athighnetworkload,averagebu erutilizationremainsratherlow,withabout85%idlebu ers.Thisisre ectiveofthehighvarianceinthework-loadthatresultsinalargegapbetweenaverageandmax-imumnetworkutilizationthatisinherentinmanyactualworkloads.Clearly,placingtheseidlebu ersinaninactivemodethatuseslessleakagepowerwillresultinsigni cantleakagepowersavings.

4.1Power-awarebufferpolicydesign

Arouterbu erisutilizedinastream-likefashion.Whena itentersarouter,itgetswrittenintoanunoccupiedbu er,andsitstherewhileaseriesofrouteroperationsistriggered:routing,virtual-channelallocationandswitchal-location.Whenitisscheduledtoleavetherouter,the itisreadfromthebu erpool,andthebu eristhenmarkedasunoccupiedandreleasedbacktothefreelist,readytobereusedwhenanew itenterstherouter.

Wetermapolicythatturnsabu ertoinactivemodeonlywhenit’sunoccupiedsingleandonethatswitchesabu ertoinactivemodeanytimeit’snotbeingaccessed,i.e.whenit’sbothunoccupiedandoccupied,double.Toevalu-atethee ectivenessofanypolicy,weneedayardstick–wede netwotheoreticallyideal,thoughunachievable,policies:

Figure3:Averageandminimumnumberofidlebu ers

outof128 its/bu er.

Ideal-Single,thatreducesleakagepowertozeroinstantlyforbu ersthatareunoccupiedwithnoadditionalpowerover-head,andIdeal-Double,thatdoessosimilarlyforbu erswhentheyarebothunoccupiedandnotbeingaccessed.Apower-awarebu erpolicycanbeoblivious,i.e.itdoesnottakecurrentbu erutilizationorworkloadintoaccount;oradaptive,tuningthepolicyaccordingtocurrentutiliza-tion.Itcanalsobeconservative,makingsurenetworkper-formanceisnotimpacted,vs.aggressive,targetingasmuchleakagepowersavingsaspossible,evenifthiscomesattheexpenseofnetworkperformance.

Fig.4showsthedesignspaceofpower-awarebu erpoli-ciesthatweenvision,andseveralsimplepoliciesthatweproposeateachdesignpoint.Eachpolicycantargeteithersingleordoubleleakagepowersavings.First,weproposeaconservativepolicy,Lookahead,thatobliviouslyplacesbu ersinlow-leakagemodeandwakesthemupNcyclesbeforetheyareaccessed.Whena itisreadfromthebu erqueue,thatbu erwillbeswitchedtothelow-leakagein-activemode(iftherearemorethanNfreebu ers),andwhena itarrivesandiswrittenintoarouterbu eratthetailofthequeue,thebu erthatisNcellsaheadwillbeswitchedtonormaloperatingmode.Thepolicyisconser-vativeasitsetsthelookaheadwindowofNtothenumberofcyclesneededtoswitchabu erfrominactivetoactivemode(transitiondelay),soafreebu erwillalwaysbeavail-ablewhen itsarrive,andnetworkperformancewillneverbea ected.Clearly,ifthebu ersizeBislessthanN,ourpolicywillresultinnoleakagepowersavings.Anaggres-sivevariantofthispolicy,Lookahead-AggsimplyshortensNtolessthanthetransitiondelay,tradingo performanceforhigherleakagepowersavings.OurimplementationofLookaheadinsertsanewlyfreedbu erbackattheheadofthefreelist,soanactivebu erhasthehighestchanceofreuse,minimizingtheimpactonnetworkperformancesigni cantly.Asimpleadaptivepolicy,wecallPredictive,usespriorbu erutilizationhistorytopredictfutureusage,adjustingthelookaheadwindowNaccordingly.Weusea

ABSTRACT Leakage Power Modeling and Optimization in Intercon(4).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
×
二维码
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)