PMP需要参考
29BActivities29CSlack elements.29DB and C only.29EAll of the above.29
210QUESTActivities with zero time duration are referred to as:210ACritical path activites.210BNoncritical path activities.210CSlack time activities.210DDummies210ENone of above.210
211QUESTIn the PDM, common constraints include:211AStart-to-start211BFinish-to-start211CFinish-to-finish211DB and C only211EA, B, and C.211
QUESTWhich of the following networking methods allows us to show that the last 10% of one element
212
cannot be completed until 62% of a previous element has been completed?212APERT212BADM212CPDM212DAll of the above.212EA and C only.212
213QUESTGuidelines for estimating time durations include:213AAssuming a normal level of labor and equipment.213BAssuming a normal work week.213CUsing consistent time units213DUsing past actual durations as guides.213EAll or part of each of the above.213
214QUESTSmoothing out resource requirements from period to period is called resource _____.214AAllocation.214BPartitioning214CLeveling.214DQuantification214ENone of above.214
QUESTAssigning resources in an attempt to find the shortest project schedule consistent with fixed
215
resource limits is called resource _____.215AAllocation.215BPartitioning215CLeveling215DQuantification.215ENone of above.215
QUESTIn general, attempts to smooth out period to period resources will _____ the scheduled time and
216
_____ project costs.216AIncrease, decrease.216BIncrease, increase216CIncrease, increase or decrease.216DDecrease, decrease.216EDecrease, increase.216
217QUESTWhich method shown below is acceptable for reducing cost or shortening the schedule?217A"Crashing"217BChanging scope.
A
D
E
C
E
C
A
B